Mass Timber Risk Strategy: Why Sequencing Determines Capital Performance

tysondirksen_Conference_room_with_development_team_reviewing__a7ca35ca-7d7e-4350-9e46-7bd31e1f5ebb_0
Feb 25,2026

Mass Timber Risk Strategy is not about defending a material. It is about controlling the sequence.

Mass timber is engineered, tested, and code-supported. The assumption that it introduces structural fragility misunderstands where risk actually originates. In long-cycle development, the dominant variable is coordination — not material selection.

In my earlier analysis of Mass Timber and Duration Risk in Long-Cycle Development, I explained how time — not product — determines capital performance. When schedule extends, IRR compresses. That principle applies directly to timber.

The issue is not timber.
The issue is sequencing discipline.


Institutional Friction Is a Mass Timber Risk Strategy Failure

When mass timber is introduced late:

• Insurers react instead of align
• Lenders slow underwriting
• Credit committees require education
• Third-party reviews expand

This is not structural risk.
It is coordination risk.

A disciplined Mass Timber Risk Strategy engages insurers during schematic design, aligns fire engineering early, and educates lenders before underwriting begins.

Late alignment creates duration exposure.
Duration exposure creates capital compression.


Procurement Discipline Is Core to Mass Timber Risk Strategy

Mass timber must be treated as a system decision — not a design upgrade.

If fabrication slots are not secured early, volatility enters the schedule. Fabrication capacity is finite. Lead times matter. Procurement timing directly influences capital timing.

I addressed this further in Mass Timber Procurement Strategy on Evolve Development Group.

Procurement is not logistics.
It is duration control.

And duration control is capital discipline.


The Real Risk Model

A structured Mass Timber Risk Strategy includes:

• Insurer engagement during schematic design
• Early fire engineering documentation
• Lender education before underwriting
• Procurement secured prior to design development

When these elements align, timber becomes an advantage — not a liability.


Closing: Risk Is Exposure, Not Material

Mass timber does not increase risk.

It exposes unprepared teams.

In long-cycle development, exposure becomes duration.
Duration becomes IRR compression.

Risk is not embedded in timber.

Risk is embedded in sequence.